97人妻互换精品全国视频,午夜亚洲色欲AV一区二区三区,在线亚洲午夜理论AV大片,日本高清无卡码一区二区久久

Contact Us

AC Fan after the installation is complete the note

Date: 2016-5-11   Click: 1492 Times

"AC Fan" after installation, flip a hand wheel, check whether tight or grazing to other sites. In the absence of exceptional circumstances, you can test run, the exposed part of the fan drive apparatus should be shielded, which in the "AC Fan" is not the whole package, user supplied, if the air inlet pipe is not connected, then, also need to add a protective cover. The fan is equipped with electronic control box must match the fan phase. In particular, note that, when the fan wiring, be sure to get a professional electrician wiring, the wiring must be correct and reliable, especially at the electrical control box terminal number must be consistent with the fan numbers on the fan after installation to check the entire installation the "AC Fan" living within the impeller is not a tool to pull down or other debris.

Back to: Industry news

+86-0769-83660708

Home Product News Contact

浦县| 介休市| 望奎县| 青海省| 巴东县| 兰考县| 上蔡县| 海南省| 永寿县| 崇信县| 名山县| 麟游县| 古丈县| 百色市| 通化县| 宜春市| 九寨沟县| 龙川县| 天柱县| 德保县| 松潘县| 霍州市| 察雅县| 威宁| 和静县| 英吉沙县| 木兰县| 上思县| 青铜峡市| 五家渠市| 仙居县| 舟曲县| 绥江县| 凤山市| 陆良县| 平阳县| 石家庄市| 谷城县| 南皮县| 华池县| 南昌市|