97人妻互换精品全国视频,午夜亚洲色欲AV一区二区三区,在线亚洲午夜理论AV大片,日本高清无卡码一区二区久久

Contact Us

Industrial Ventilation Fan tips

Date: 2014-10-13   Click: 1445 Times

Before "Industrial Ventilation Fan" installation
1, the fan should be checked before installing it is intact, fastener bolts are loose or fall off, if collisions impeller cover. Carefully check the fan or blinds during transport without deformation damage.
2, the installation select export environment, you should pay attention to the socket can not have too much ~ ~ face obstacles in 2.5-3M's.
When "Industrial Ventilation Fan" installation
A smooth installation: the installation should pay attention to the horizontal position of the fan, the fan and mounting the motor to adjust to a solid foundation can not have tilted horizontal plane.
2, the fan should be installed so that the motor in position adjustment bolts, easy to operate. Adjust the belt tension when convenient to use.
3, when installing the fan bracket, be sure to let stand firm and level ground plane, reinstall the angle iron reinforcement if necessary, the next fan.
4, after installing the fan, check the tightness around. If this gap is, the available solar panels sealed plastic or glass.
After installation "Industrial Ventilation Fan"
1, after the installation is complete, check the internal fan to stay estate tools and debris. Hand or toggle lever blades, check whether tight or collision phenomenon, whether the project did not interfere with the rotation of the test run before the exception.
2, in operation, if there is vibration or fan motors have "buzz" abnormal sounds or other anomalies, should stop to check, repair, and then get started.

Back to: Industry news

+86-0769-83660708

Home Product News Contact

五河县| 连平县| 调兵山市| 泽州县| 敖汉旗| 自贡市| 成都市| 辽阳县| 穆棱市| 龙井市| 江都市| 余江县| 康马县| 太原市| 门源| 东明县| 塔城市| 华池县| 额敏县| 阿拉善盟| 伽师县| 渭源县| 江安县| 伊宁市| 巍山| 手机| 原平市| 北京市| 綦江县| 禹城市| 敦化市| 那曲县| 通州市| 瓮安县| 安陆市| 普兰店市| 汽车| 南康市| 马山县| 宣武区| 兴化市|